Malysheva Voevodina Shopping Mall
Ekaterinburg


Project details

Client
Smart Pro

Building Area

902m2  9,709ft2

Construction Period

Main Contractor
Not Appointed

Structural Engineers

Not Appointed

M&E Engineers

Not Appointed

Quantity Surveyors

Not Appointed

Malysheva Voevodina 01

The Stables Shopping Mall
St Petersburg


Project details

Client
-

Building Area

Construction Period

Main Contractor
-

Structural Engineers

M&E Engineers

Quantity Surveyors

The Stables Shopping Mall St Petersburg 01

The Mall
Wood Green London


Project details

Client
The Mall Corporation

Building Area

300,000ft2

Construction Period

3 Years

Main Contractor
-

Structural Engineers

Dewhurst 

M&E Engineers

EM Technica

Quantity Surveyors

CBA

10The Mall Wood Green London 10

The Mall Marlands
Southampton


Project details

Client
The Mall

Building Area

2,928m2  31,517ft2

Construction Period

9 Months

Main Contractor
Dean and Bowes

Structural Engineers

Elliott Wood Partnership

M&E Engineers

E+M Tecnica

Quantity Surveyors

Michael Porter Associates

1The-Mall-Marlands-Southampton06

< Prev Project | Next Project >